Construction continues on the new Assembly Hall, part of the House of Learning at Thompson Rivers University.
The structure will become the main focal point and centerpiece of the University. Inspired by the traditional "Keek-wili" pit houses of the interior tribes, the completed building will feature a sod roof, and log roof panels consisting of 492 beetle-killed pine logs.
Local Log and Timber producer Nicola LogWorks produced and installed the timber and log components on the roof of Assembly Hall.
The design parameters of the project were governed by LEEDs criteria for green building and the new “Wood First” policy for government and public structures. (If possible, feature wood rather than mainstream concrete and steel).
Construction on the House of Learning is expected to be complete in the Spring of 2011.